Proven to Avoid Utility Delays
" Upgrading our electrical infrastructure was like opening of can of worms. The utility wasn't responsive and our electrician said we needed to upgrade our switch gear and grounding rods before we could add electric chillers. Tecogen's engine-driven chillers ended up having the lowest operating and installation cost. "
- Office Building Customer replaced 2000 ton absorption chillers with Tecochill chillers
" We wouldn't have had enough power for 12 to 18 months and needed to open. Instead of waiting, we started powering the lights with InVerde generators and the cooling with Tecogen chillers. Now we have grid power but run them for the heat and to lower our energy bills. "
- Indoor Cultivation Factory operates a 2.5 MW cogeneration system